Phase 2: Dashboard binder + de-tmuxing sweep #435

Merged
mph merged 4 commits from IW-423-phase-02 into IW-423 2026-08-23 18:33:32 +00:00
Owner

Phase 02 implementation for IW-423.

Files

Browse changed files: https://code.iterative.works/iterative-works/iw-cli/-/blob/IW-423-phase-02/

Phase 02 implementation for IW-423. ### Files Browse changed files: https://code.iterative.works/iterative-works/iw-cli/-/blob/IW-423-phase-02/
Dashboard binder + de-tmuxing sweep
Some checks failed
CI / contract (pull_request) Has been skipped
CI / format (pull_request) Successful in 7s
CI / lint (pull_request) Successful in 7s
CI / compile (pull_request) Failing after 2m37s
CI / test (pull_request) Has been skipped
CI / dashboard-build (pull_request) Has been skipped
e756b5f2e7
- ServerWorkspace resolves the configured backend per creation request via WorkspaceBackend.resolve
- CaskServer no longer names TmuxAdapter and touches only create/attachHint/unavailableHint on the port
- TerminalWorkspaceOps gains unavailableHint with all four implementations pinned by tests
- TmuxError becomes TerminalWorkspaceError and WorktreeCreationResult drops its tmux-named fields
- attachCommand is built from attachHint(sessionName) instead of a hand-written string
- Copy button no longer interpolates the command into a JavaScript string literal
- docs/server-config.md documents workspaceBackend and the generated API docs are refreshed
chore(IW-423): update review-state for phase 02
All checks were successful
CI / contract (pull_request) Has been skipped
CI / format (pull_request) Successful in 8s
CI / lint (pull_request) Successful in 9s
CI / compile (pull_request) Successful in 1m31s
CI / dashboard-build (pull_request) Successful in 1m18s
CI / test (pull_request) Successful in 11m22s
88059f9879
chore(IW-423): record CI Bloop timeout and set phase 02 awaiting review
All checks were successful
CI / contract (pull_request) Has been skipped
CI / format (pull_request) Successful in 7s
CI / lint (pull_request) Successful in 7s
CI / compile (pull_request) Successful in 1m21s
CI / dashboard-build (pull_request) Successful in 58s
CI / test (pull_request) Successful in 10m6s
80ce673ae0
CI run 486 is green. The earlier compile failure was a Bloop build-server
timeout with no compile error in the log, recorded as LESSONS entry 20.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01TEMXsdxXN2NJxJWQjM6eYt
mph merged commit 8aa9f46f0d into IW-423 2026-08-23 18:33:32 +00:00
mph deleted branch IW-423-phase-02 2026-08-23 18:33:38 +00:00
Sign in to join this conversation.
No description provided.